February 24 | Top of Freeride maintenance.
Maintenance
Trail maintenance at the top of free ride with braking bumps fixed.
Date
24th February 2024
Attendance:
Committee members: 5
Guests:8
Notes:
Trails were very busy, see below a reference image of all the users on the site on the day. A lot of teenagers present all wearing the correct safety equipment and with correct mountain bikes.
Generally we accomplished a lot and have made the upper free ride much better. Starting at the top we pushed the first main berm back to allow for a better flow into the “shark fin” feature. Next we removed braking bumps and re added the right hand lip option on the “motorway” section with the table top before the bomb hole getting a re worked lip and on the landing the drainage issue has been resolved. Dirt was added to the bomb hole run into the step up as it has been getting a bit too beat up over the winter.